FORM
VACUUM

FORM VACUUM / REFERENCE

Preparing a useful forming trial

Measure the sheet before measuring the mould. The clamp frame holds a 235 millimetre square sheet, while the useful forming bed is smaller. Space must remain around the mould for the material to draw down and contact the bed. Our review limits the entered mould envelope to a conservative planning box; it cannot establish how much material will thin at a particular corner.

Consider the release direction next. Deep recesses and undercuts can lock a mould into the formed shell even if every outside dimension appears to fit. Suitable draft, a smooth surface and appropriate mould construction require attention before heating. Follow the actual equipment and material documentation for ventilation, heat exposure and connection of the separate vacuum source. Do not infer safe processing temperatures from a material name alone.

Begin with an expendable sample and inspect the result for uneven thickness, webbing and distortion. Adjust one relevant process condition at a time and document the outcome. The sheets in this catalogue carry no claim for food contact, medical use, protective performance or structural duty. A visually successful shell is not evidence of certification.